How could I install RSD for new systems

Installing Rapid Shutdown (RSD) for new solar systems can be relatively straightforward as you have the opportunity to plan and integrate the RSD solution from the beginning. Here are the steps to consider when installing RSD for a new system:

1.Understand the RSD Requirements: Familiarize yourself with the RSD requirements and regulations in your region. Research the local electrical codes, building regulations, and industry standards that govern RSD implementation. Ensure you understand the specific criteria for RSD, such as shutdown time, voltage and current limits, and equipment compatibility.

2.Design the System with RSD in Mind: During the system design phase, incorporate the RSD solution into your plans. Consider the type of RSD solution you want to implement, such as module-level power electronics (MLPE), string-level RSD devices, or inverter-integrated RSD solutions. Ensure that the selected RSD solution meets the requirements and standards of your region.

3.Select and Procure RSD Components: Based on your system design, select the appropriate RSD components and equipment. This may include MLPE devices, RSD switches, inverter-integrated RSD models, or any other necessary components. Ensure that the chosen components are compatible with each other and meet the required standards.

4.Install RSD Components: During the installation process, incorporate the RSD components into the solar system. Follow the manufacturer’s instructions and guidelines for each component. This may involve installing MLPE devices at the module level, integrating RSD switches or devices at the string level, or configuring inverter-integrated RSD systems.

5.Wiring and Connections: Properly wire and connect the RSD components to ensure the rapid shutdown functionality. Ensure that the wiring is done according to the manufacturer’s specifications, adhering to electrical safety standards and local regulations. Consider labeling the RSD components and wiring for clarity and future maintenance.

6.Configuration and Testing: Configure the RSD system according to the manufacturer’s instructions. This may involve setting up communication protocols, programming inverters or RSD devices, and testing the system to ensure proper operation. Verify that the RSD functions as expected and meets the required shutdown time and safety criteria.

7.Compliance and Documentation: Ensure that your RSD installation complies with the applicable regulations and standards in your region. Keep documentation of the RSD installation, including equipment specifications, wiring diagrams, test results, and any other relevant information. This documentation may be required for inspections or future maintenance.

It’s essential to involve qualified professionals, such as solar installers or electrical contractors experienced in RSD installations, to ensure the proper design, installation, and compliance of the RSD system for your new solar installation. They can provide expert guidance, perform the necessary electrical work, and ensure the safe and effective implementation of RSD in your new system.

en_USEnglish
Scroll to Top

Find your ideal solar solution